Started the work at Villa la Massa, Bagno a Ripoli-Florence

Home  /  Renovations  /  Work in Progress  /  Started the work at Villa la Massa, Bagno a Ripoli-Florence

Started the work at Villa la Massa, Bagno a Ripoli-Florence: it will have to do 2 interventions:

-a realization of an underground tunnel that from the outdoor pool accesses technical rooms

-reconstruction of a ex barn to be used as a bistrot and changing room for pool

Anno::

2019

Date: